Constitution Index · H.R. 1047 · 2025-02-06
GRID Power Act
Latest official status (2025-09-19): Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
Constitutional grade
A
Constitutional
The GRID Power Act operates within FERC's existing authority over interstate electricity transmission and wholesale power markets. It directs prioritization of dispatchable generation in interconnection queues to improve grid reliability and resource adequacy. This is an economic regulation reasonably tied to Congress's Commerce Clause power, does not infringe individual rights, and does not take property or bypass due process. The rulemaking and proposal-review process preserves procedural safeguards.
Article I, Section 8, Clause 3 Amendment X
SI-generated grade · passed automated checks (real Constitution citation, language rules) · not individually reviewed by a person · methodology · Report an error: hello@valuesforamerica.com
The five checks
Enumerated powers · passes
Congress has authority under Article I, Section 8, Clause 3 to regulate interstate commerce, and the interstate transmission and wholesale electricity grid has long been an area of federal regulation through FERC. Interconnection requests to high-voltage transmission lines are part of that interstate system. The bill asks FERC to revise procedures within its existing jurisdiction, so it does not exceed enumerated federal power.
Bill of Rights · passes
The bill does not restrict speech, religion, assembly, petition, press, arms, or any other provision of the Bill of Rights. It is an economic regulatory directive to FERC and transmission providers. It does not involve search, seizure, self-incrimination, trial rights, cruel punishment, or quartering.
Individual liberty · passes
The bill does not restrict what individuals may do with their own person, property, speech, labor, or belief. It affects the order in which large generating units are processed for grid interconnection. To the extent it affects business interests, the government's interest in reliable electricity supply and resource adequacy is a permissible and substantial justification for the prioritization.
Decentralization · passes
The interstate electricity grid cannot be effectively managed by individual families, local communities, or single states alone because transmission lines and wholesale markets cross state lines. FERC already has the federal role in interconnection queue procedures. The bill does not consolidate power at a higher level than necessary; it merely directs FERC to modify an existing federal process. It does not violate the Tenth Amendment because the subject is interstate commerce and FERC's jurisdiction is long established.
Due process and takings · passes
The bill does not take private property without just compensation. Interconnection queue position is not a vested property right, and even if it were, the bill operates through FERC rulemaking and transmission provider proposals subject to FERC review. Affected parties have the opportunity to participate in the regulatory process. The 60-day approval requirement does not bypass due process.
Provenance
- Congress.gov: HR 1047 summary · fetched 2026-10-08 · official page ↗
Version history · never overwritten
| Grade | Graded | Rubric | Source hash | Status |
|---|---|---|---|---|
| A · #434 | 2026-10-09 | vfa-constitutional-grade/1.0 | a6433edd232c | current |
Cite this
Values for America. “Constitutional grade: H.R. 1047, GRID Power Act.” VFA Constitution Index, grade 434 (rubric vfa-constitutional-grade/1.0), graded October 9, 2026. https://www.valuesforamerica.com/constitution-index/grades/434. Accessed 2026-10-19.
Permalink: https://www.valuesforamerica.com/constitution-index/grades/434
Data: this grade as JSON · full export. Attribution required.