H.Res. 1326 explained  ·  117th Congress  ·  Not enacted (117th Congress ended)

Of inquiry requesting the President, and directing the Secretary of Energy, to transmit to the House of Representatives certain information relating to plans to protect baseload bulk power system generation and transmission to maintain bulk power system reliability.

Create a free account or sign in to follow H.Res. 1326 and get alerts. Policy area: Energy Create a free account or sign in to follow the Energy policy area and get alerts. ▲ 1480 days since action Sponsor: Greg Pence, IN-06, R → Congress.gov

Introduced: 2022-08-26

Latest action (2022-09-30): Placed on the House Calendar, Calendar No. 141.

What H.Res. 1326 does, in plain terms

The Congressional Research Service has not published a summary of H.Res. 1326 yet. Its official title: “Of inquiry requesting the President, and directing the Secretary of Energy, to transmit to the House of Representatives certain information relating to plans to protect baseload bulk power system generation and transmission to maintain bulk power system reliability.”.

Constitution Index

“VFA Constitution grade”

Not graded yet

H.Res. 1326 has not been graded yet. New measures with an official summary are graded daily under the published rubric.

What should pass

“VFA SI Solution”

No solution yet

A sourced SI draft appears here once it passes automated checks (Constitution citation, source verification, independent SI critic). How publication works.

Share card

1200×675 PNG for X, Threads, LinkedIn and messages. Free to share with a link back to this page.

For journalists and bloggers

“Embed this grade”

Free to use with the link back. The badge and card update when the grade changes. Embed terms →

VFA Constitution grade for H.Res. 1326

← Back to the Republic